The
62.4-megawatt Ashtabula wind farm is owned by a subsidiary of NextEra
Energy Resources. The contract includes an option for Otter Tail Power
to own the wind farm in 10 years.
According to Harvey McMahon, Otter Tail Power’s manager of renewable energy construction and operations,A letter folding machine is
a piece of equipment which is designed to fold paper. this energy
purchase was below the cost modeled in the company’s biennial resource
plan. In addition, the purchase positions the company to meet its
renewable energy obligations in the three states it serves through 2025.
Wind energy now will supply about 19 percent of Otter Tail Power Company’s retail sales.
“This
is positive for our customers,” said McMahon. “This offer was low cost
when compared with other resources, including other risk-adjusted wind
proposals. The bill impact will be negligible,The home is served
simultaneously by the residential wind turbines and
the utility. usually zero and sometimes less, because this low-cost
wind purchase will replace other energy purchases that otherwise would
be required to serve customers, particularly over the long term.”
Ashtabula
III consists of 39 1.6-megawatt GE XLE turbines and is capable of
producing enough electricity for 19,000 homes. The wind farm began
commercial operation in 2010. A subsidiary of NextEra Energy Resources
operates Ashtabula III and will continue to do so.
“Purchasing
energy from an existing wind farm eliminates the permitting risk and
construction risk associated with building a new farm, including the
risk that Congress won’t continue to extend the production tax credit,”
McMahon said. “Additionally, Ashtabula III’s proximity to two wind farms
we own and our familiarity with NextEra, which operates and maintains
those wind farms on our behalf, makes purchasing energy from Ashtabula
III a good fit for us.”
Global Tech I,All Continental flatwork ironer offer
easy-to-operate controls that provide efficient performance and
flexibility. located 180km from the Bremerhaven sea port in Northwest
Germany consist of eight turbines, each with a capacity of 5MW – capable
of a total generation capacity of 400MW and able to produce around 1.4
billion kilowatt hours of energy per year; equivalent to approximately
445,000 households.
The substation links the wind generating turbines to the grid connection point.
Almost
delivered the high voltage equipment, power transformers, and
protection and control systems while Keppel Verolme carried out the
engineering, construction, and offshore installation work.All the
personnel that deal with our industrial washing machine servicing are dedicated to the service department.
Florian Zschoge, Alstom Grid’s project leader, said,It enables washer extractor to
communicate with chemical pumping machines. ‘This platform concept is
an interesting alternative to traditional topside-jacket-installations
and could become one standard solution in the offshore wind business.
‘We
are very proud to deliver state of the art technology for the Global
Tech I project. This is certainly another important contribution to the
German energy turnaround.’
Arjen
Schampers, technical director of Global Tech I Offshore Wind said, ‘The
inner park substation platform is the centrepiece of our offshore wind
farm. As the consortium leader, Alstom Grid contributed significantly to
the success of this milestone. Our initial trust in Alstom Grid’s
experience was confirmed through professional project management, a
cooperative approach and the proven technology of our electro-technical
equipment.’
Showing posts with label laser welding. Show all posts
Showing posts with label laser welding. Show all posts
Thursday, May 16, 2013
Wednesday, May 15, 2013
KC Couple Charged with Confining Girl in Basement
A Kansas City couple was taken into custody Wednesday on charges that they confined a 9-year-old girl in a basement with a sewage leak, failed to seek treatment for her severe infections and only allowed her to go to the bathroom outdoors.A letter folding machine is a piece of equipment which is designed to fold paper.
Jackson County prosecutors waited until the girl’s 30-year-old father and his 27-year-old live-in girlfriend were in custody to announce that they had been charged Tuesday with one count each of abuse or neglect of a child, child endangerment and felonious restraint. They each are being held on $100,000 bond, according to court records.
The Associated Press is withholding their names to protect the girl’s identity. Mike Mansur, a spokesman for the prosecutor’s office, said in an email he didn’t know whether the couple has an attorney. None are listed for them in online court records.
Authorities were called Friday after a school nurse in the Kansas City suburb of Independence became concerned. The girl, who had been sent to the nurse’s office, reeked of urine, a Jackson County sheriff’s deputy wrote in the probable cause statement.
The girl told the nurse she was locked in a basement at home with little food and water as punishment for a recent school suspension, according to the probable cause statement.
She also told the nurse her “private parts hurt” and was taken to a hospital to be evaluated, the probable cause statement said. While receiving treatment, the girl said she couldn’t remember the last time she used the restroom inside the home. The girl is now in state foster care, Mansur said.
At the home in Kansas City, deputies found sewage leaking into the unfinished basement and discovered the girl had been sleeping on a deflated air mattress. Her clothes were outside the home in a small pile, covered in dirt and smelling of mildew. The door from the basement to the outside wouldn’t close, the probable cause statement said.
Deputies described the upstairs, where the father, his girlfriend and her son slept, as clean and generally tidy. There was a lock and chain on a door separating the upstairs from the basement stairs and an alarm that sounded when it opened, the probable cause statement said.
The girlfriend told authorities that the girl “prefers to spend time in the basement” because she doesn’t want to be around the family and began sleeping down there in February because of toileting accidents that had ruined several mattresses. She added that she believed the girl urinated on herself purposefully to “keep people away,” the probable cause statement said.
The girlfriend said she also began forcing the girl to urinate and defecate outside about three weeks ago after contracting a urinary tract infection that she believed she caught from using the same toilet as the child,It enables washer extractor to communicate with chemical pumping machines. the deputy wrote.
The father said he bathes the girl “every five days or so.” He said the girl doesn’t like to bathe, possibly because she was sexually and physically assaulted in the shower, although the probable cause statement doesn’t indicate who committed that abuse.All the personnel that deal with our industrial washing machine servicing are dedicated to the service department. The father acknowledged that failing to bathe the girl caused severe yeast and staph infections. He said he didn’t seek treatment because “what difference would it make,” the deputy wrote.The home is served simultaneously by the residential wind turbines and the utility.
The father also said he doesn’t regularly wash the girl’s clothes because he doesn’t own a working washing machine,All Continental flatwork ironer offer easy-to-operate controls that provide efficient performance and flexibility. the probable cause statement said.
The father said that as a punishment for being suspended, he “popped” the girl in the mouth and “whooped” her bottom before confining her to the basement with bottled water and a packed lunch while he was at work.
Jackson County prosecutors waited until the girl’s 30-year-old father and his 27-year-old live-in girlfriend were in custody to announce that they had been charged Tuesday with one count each of abuse or neglect of a child, child endangerment and felonious restraint. They each are being held on $100,000 bond, according to court records.
The Associated Press is withholding their names to protect the girl’s identity. Mike Mansur, a spokesman for the prosecutor’s office, said in an email he didn’t know whether the couple has an attorney. None are listed for them in online court records.
Authorities were called Friday after a school nurse in the Kansas City suburb of Independence became concerned. The girl, who had been sent to the nurse’s office, reeked of urine, a Jackson County sheriff’s deputy wrote in the probable cause statement.
The girl told the nurse she was locked in a basement at home with little food and water as punishment for a recent school suspension, according to the probable cause statement.
She also told the nurse her “private parts hurt” and was taken to a hospital to be evaluated, the probable cause statement said. While receiving treatment, the girl said she couldn’t remember the last time she used the restroom inside the home. The girl is now in state foster care, Mansur said.
At the home in Kansas City, deputies found sewage leaking into the unfinished basement and discovered the girl had been sleeping on a deflated air mattress. Her clothes were outside the home in a small pile, covered in dirt and smelling of mildew. The door from the basement to the outside wouldn’t close, the probable cause statement said.
Deputies described the upstairs, where the father, his girlfriend and her son slept, as clean and generally tidy. There was a lock and chain on a door separating the upstairs from the basement stairs and an alarm that sounded when it opened, the probable cause statement said.
The girlfriend told authorities that the girl “prefers to spend time in the basement” because she doesn’t want to be around the family and began sleeping down there in February because of toileting accidents that had ruined several mattresses. She added that she believed the girl urinated on herself purposefully to “keep people away,” the probable cause statement said.
The girlfriend said she also began forcing the girl to urinate and defecate outside about three weeks ago after contracting a urinary tract infection that she believed she caught from using the same toilet as the child,It enables washer extractor to communicate with chemical pumping machines. the deputy wrote.
The father said he bathes the girl “every five days or so.” He said the girl doesn’t like to bathe, possibly because she was sexually and physically assaulted in the shower, although the probable cause statement doesn’t indicate who committed that abuse.All the personnel that deal with our industrial washing machine servicing are dedicated to the service department. The father acknowledged that failing to bathe the girl caused severe yeast and staph infections. He said he didn’t seek treatment because “what difference would it make,” the deputy wrote.The home is served simultaneously by the residential wind turbines and the utility.
The father also said he doesn’t regularly wash the girl’s clothes because he doesn’t own a working washing machine,All Continental flatwork ironer offer easy-to-operate controls that provide efficient performance and flexibility. the probable cause statement said.
The father said that as a punishment for being suspended, he “popped” the girl in the mouth and “whooped” her bottom before confining her to the basement with bottled water and a packed lunch while he was at work.
Wednesday, April 24, 2013
Arcade-y Game That Lacks Depth
There's not a really tidy way to categorize Chillingo's Madmonster. It's not a runner, even though it does task you with guiding a tiny monster dude around a world from left to right in an endless charge. It's not a platform game, even though its core mechanic revolves around that monster bouncing up and down and smashing various objects. It's a game that sits in the middle between these two genres, satisfying neither's conditions as neatly as I want it to. And while I'm being wishy-washy: it's not a thrilling game, either, though it is a competent arcade-y game.
To rewind: In Madmonster, you control a brown-ish, pink fuzz ball with some nasty looking teeth in an overall quest to destroy everything in its path. By tapping on either the left or the right side of the screen, you plough this furry ball of death into anything that gets in its way. Curiously,If you're looking for a fun and memorable way to impress, you'll want to consider make your own bobblehead. whenever you make contact with an object -- be it tank,We're making Book scanner and digitization accessible to everyone. bomb or even satellite dish -- the monster bounces off of it and then goes airborne. The more junk you run into as you're flying through the air, the higher you go. If you get high enough, you hit outer space, instantly reminding you that, yes, this is a video game.
The overarching goal is simple enough -- destroy stuff,This Roof hook set is solar powered and brightens any garden. got it; check. But the scenario design does a good job breaking this task down into its finer parts,Have a look at all our Custom bobbleheads models starting with free proofing. giving you more to do than wanton savagery. To get through a given level, you might need to obliterate 10 helicopters, 10 tanks, and ten infantry. Or maybe you'll need to stay airborne for a handful of seconds, as well as kill 10 tanks and 10 infantry. A handy chunk of UI in the corner reminds you of the tasks needed to progress, while a timer keeps you from hanging out and chilling instead of wrecking stuff.
The core loop goes pretty predictably.It's easy to fall in love with the sheer, incomparable strength of tungsten jewelry. Run into a level, smash into stuff, and rocket up and away into the skies while smashing into more and more stuff. I've been getting cheap arcade thrills from this and the controls feel fine, but there's not much more to it. I feel like there needs to be a little more depth here. Also, strangely, Madmonster does a really bad job pointing out when there's an object underneath you, which makes keeping a bouncing combo going almost entirely a luck-based thing.
That's not to say it's bad; this is a competent game. Everything works. You hit stuff, you get points. Click; treat. It's when you start needing something less visceral from the game is when it starts falling apart in my head.
Anyway, now for the model: even though this is a regular, premium game Madmonster has an in-game store. You can buy power-ups, upgrades for your ball, decorations, new monsters, and consumable items from it with coins, which can be grabbed in levels or obtained via an in-app purchase. I really don't want to spend an hour talking about this, so I won't. I'll just leave it at this: my initial impression is that this game is pretty aggressive with its store, which is baffling since, you know, the game cost money and all.
If you just like flipping out your phone and doing something mindless, this might just be up your alley. Just check out the video we've got in this post to see if it'll click with you, otherwise maybe keep tabs on our forum thread and see what other people are thinking, too. Who knows? Maybe it has a super exciting end game.
To rewind: In Madmonster, you control a brown-ish, pink fuzz ball with some nasty looking teeth in an overall quest to destroy everything in its path. By tapping on either the left or the right side of the screen, you plough this furry ball of death into anything that gets in its way. Curiously,If you're looking for a fun and memorable way to impress, you'll want to consider make your own bobblehead. whenever you make contact with an object -- be it tank,We're making Book scanner and digitization accessible to everyone. bomb or even satellite dish -- the monster bounces off of it and then goes airborne. The more junk you run into as you're flying through the air, the higher you go. If you get high enough, you hit outer space, instantly reminding you that, yes, this is a video game.
The overarching goal is simple enough -- destroy stuff,This Roof hook set is solar powered and brightens any garden. got it; check. But the scenario design does a good job breaking this task down into its finer parts,Have a look at all our Custom bobbleheads models starting with free proofing. giving you more to do than wanton savagery. To get through a given level, you might need to obliterate 10 helicopters, 10 tanks, and ten infantry. Or maybe you'll need to stay airborne for a handful of seconds, as well as kill 10 tanks and 10 infantry. A handy chunk of UI in the corner reminds you of the tasks needed to progress, while a timer keeps you from hanging out and chilling instead of wrecking stuff.
The core loop goes pretty predictably.It's easy to fall in love with the sheer, incomparable strength of tungsten jewelry. Run into a level, smash into stuff, and rocket up and away into the skies while smashing into more and more stuff. I've been getting cheap arcade thrills from this and the controls feel fine, but there's not much more to it. I feel like there needs to be a little more depth here. Also, strangely, Madmonster does a really bad job pointing out when there's an object underneath you, which makes keeping a bouncing combo going almost entirely a luck-based thing.
That's not to say it's bad; this is a competent game. Everything works. You hit stuff, you get points. Click; treat. It's when you start needing something less visceral from the game is when it starts falling apart in my head.
Anyway, now for the model: even though this is a regular, premium game Madmonster has an in-game store. You can buy power-ups, upgrades for your ball, decorations, new monsters, and consumable items from it with coins, which can be grabbed in levels or obtained via an in-app purchase. I really don't want to spend an hour talking about this, so I won't. I'll just leave it at this: my initial impression is that this game is pretty aggressive with its store, which is baffling since, you know, the game cost money and all.
If you just like flipping out your phone and doing something mindless, this might just be up your alley. Just check out the video we've got in this post to see if it'll click with you, otherwise maybe keep tabs on our forum thread and see what other people are thinking, too. Who knows? Maybe it has a super exciting end game.
Wednesday, April 10, 2013
Falmouth Votes Against Dismantling 2 Wind Turbines
A Cape Cod town that once considered its first wind turbine the crowning achievement of its climate protection plan came close to becoming the first community in the country to decide to tear its turbines down.
Falmouth’s Town Meeting voted down a measure Tuesday night that would have authorized borrowing $14 million to dismantle two turbines.
The measure failed by a vote of 125-72. Town Clerk Michael Palmer said it needed a two-thirds majority to pass. If it had been approved, the borrowing question would have been put before voters in a May referendum.
The Falmouth selectmen’s board chair, Kevin Murphy, flatly calls the turbine project a failure. The board is backing efforts to dismantle the original turbine, which began spinning in 2010, and a newer one.
From the start, neighbors have complained about noise from the turbines. They also attribute a range of physical and mental health problems to them.
But other residents report no problems. Some in town say it’s far too soon to tear down a critical renewable energy project they estimate could produce $450,000 in annual revenue through energy production and renewable energy certificates.
The American Wind Energy Association, which says it promotes wind energy as a clean source of electricity, said it’s the first time any town has considered taking down its turbines. That’s because such projects have such clear financial and environmental rewards, spokeswoman Ellen Carey said.
“People across the country are supportive of wind energy and are benefiting economically,” she said.
Both turbines are built at the town’s waste water treatment plant and provide power for it. The original turbine was the first municipal utility-scale turbine in Massachusetts.
Falmouth resident Mark Cool, who lives near the turbine site,On particularly windy days,wind power generators can surpass all other electricity sources in a country. said persistent headaches started as soon as it began running. He described some so penetrating he felt he needed “to drill a hole in my head to get some sort of relief.”
The 54-year-old air traffic controller didn’t link the turbines to his headaches until his neighbors began talking about similar symptoms.
Cool began a journal, recording variables such as wind direction and headache duration, eventually concluding the headaches occurred only when the wind put him in a turbine’s wake.
In May 2012, 47 people told a board of health hearing about various problems they blamed on the turbines, including sleep deprivation, vertigo and memory loss. But 15 others said there were no problems.
Cool said he doesn’t think there’s science to substantiate negative effects from turbines.
In pushing for their removal, he points to what he said is indisputable, such as noise problems that led the town in May 2012 to shut the turbines down for 12 hours each night. A state study later concluded the turbines’ decibel level was too high at one of its testing sites. Murphy said the reduced hours mean the turbines now lose $100,000 a year.
Worse, Murphy said, is the corrosive town-wide division caused by the turbines,Choose a Tumble dryer from featuring superior clothes drying programmes and precise temperature controls. which he said taints any renewable energy plans. It’s worth it, he said, to borrow the $14 million to get rid of what he calls symbols of failure.
“Any time (residents) ride by those wind turbines they’re reminded of how divided this community is,” he said. “We need to get rid of the division and move forward.A dry-cleaning machine is similar to a combination of a domestic Industrial washing machine, and clothes dryer.” But Falmouth resident Megan Amsler said the debate has not split the town.
Amsler, who served on a town committee that devised ways to mitigate the turbines’ impact, said a silent majority in Falmouth wants to keep the turbines. But a vocal minority has made it something Falmouth can’t even agree to disagree about,While there are many brands and makes of Dry cleaning machine, they are all basically the same in principle and function. she said.
There are far cheaper ways to deal with concerns about the turbines and keep them running, Amsler said. Options include scheduling their operation more precisely to minimize any effects on neighborhoods and buying out adjacent properties.
Amsler added that tearing down the turbines will set a horrible national precedent. Banks will get skittish about financing renewables if a project with the broad local support, like Falmouth’s, can be quickly dismantled by a small group, she said.
Falmouth’s Town Meeting voted down a measure Tuesday night that would have authorized borrowing $14 million to dismantle two turbines.
The measure failed by a vote of 125-72. Town Clerk Michael Palmer said it needed a two-thirds majority to pass. If it had been approved, the borrowing question would have been put before voters in a May referendum.
The Falmouth selectmen’s board chair, Kevin Murphy, flatly calls the turbine project a failure. The board is backing efforts to dismantle the original turbine, which began spinning in 2010, and a newer one.
From the start, neighbors have complained about noise from the turbines. They also attribute a range of physical and mental health problems to them.
But other residents report no problems. Some in town say it’s far too soon to tear down a critical renewable energy project they estimate could produce $450,000 in annual revenue through energy production and renewable energy certificates.
The American Wind Energy Association, which says it promotes wind energy as a clean source of electricity, said it’s the first time any town has considered taking down its turbines. That’s because such projects have such clear financial and environmental rewards, spokeswoman Ellen Carey said.
“People across the country are supportive of wind energy and are benefiting economically,” she said.
Both turbines are built at the town’s waste water treatment plant and provide power for it. The original turbine was the first municipal utility-scale turbine in Massachusetts.
Falmouth resident Mark Cool, who lives near the turbine site,On particularly windy days,wind power generators can surpass all other electricity sources in a country. said persistent headaches started as soon as it began running. He described some so penetrating he felt he needed “to drill a hole in my head to get some sort of relief.”
The 54-year-old air traffic controller didn’t link the turbines to his headaches until his neighbors began talking about similar symptoms.
Cool began a journal, recording variables such as wind direction and headache duration, eventually concluding the headaches occurred only when the wind put him in a turbine’s wake.
In May 2012, 47 people told a board of health hearing about various problems they blamed on the turbines, including sleep deprivation, vertigo and memory loss. But 15 others said there were no problems.
Cool said he doesn’t think there’s science to substantiate negative effects from turbines.
In pushing for their removal, he points to what he said is indisputable, such as noise problems that led the town in May 2012 to shut the turbines down for 12 hours each night. A state study later concluded the turbines’ decibel level was too high at one of its testing sites. Murphy said the reduced hours mean the turbines now lose $100,000 a year.
Worse, Murphy said, is the corrosive town-wide division caused by the turbines,Choose a Tumble dryer from featuring superior clothes drying programmes and precise temperature controls. which he said taints any renewable energy plans. It’s worth it, he said, to borrow the $14 million to get rid of what he calls symbols of failure.
“Any time (residents) ride by those wind turbines they’re reminded of how divided this community is,” he said. “We need to get rid of the division and move forward.A dry-cleaning machine is similar to a combination of a domestic Industrial washing machine, and clothes dryer.” But Falmouth resident Megan Amsler said the debate has not split the town.
Amsler, who served on a town committee that devised ways to mitigate the turbines’ impact, said a silent majority in Falmouth wants to keep the turbines. But a vocal minority has made it something Falmouth can’t even agree to disagree about,While there are many brands and makes of Dry cleaning machine, they are all basically the same in principle and function. she said.
There are far cheaper ways to deal with concerns about the turbines and keep them running, Amsler said. Options include scheduling their operation more precisely to minimize any effects on neighborhoods and buying out adjacent properties.
Amsler added that tearing down the turbines will set a horrible national precedent. Banks will get skittish about financing renewables if a project with the broad local support, like Falmouth’s, can be quickly dismantled by a small group, she said.
Subscribe to:
Posts (Atom)